§ 500.480. Time Requirement.  


Latest version.
  • Where land-disturbing activity appears to have temporarily or permanently ceased on a portion of a site for fourteen (14) consecutive days, all disturbed area shall be protected from erosion by stabilizing the area with mulch or other similarly effective soil-stabilizing BMPs. Where implementation of stabilization measures is precluded by weather, snow cover or other reason beyond the LD permit holder's control, the Director may allow the LD permit holder to delay the implementation of such stabilization measures for a reasonable period.
Ord. No. 1320 §1, 2-18-2010